[LincolnTalk] Lincoln School Project: Settling into place

classic Classic list List threaded Threaded
1 message Options
Reply | Threaded
Open this post in threaded view
|

[LincolnTalk] Lincoln School Project: Settling into place

kim bodnar

Update: Lincoln School Project

Honoring our History, Building Our Future


All the modular units are in place, and work in underway to connect them. Each unit contains the halves of two classrooms and half a hallway, so when two get attached, they create two classrooms and a part of a hallway. All the units will be connected so that it is a self-contained K-4 building.

Dates to Note...


--
The LincolnTalk mailing list.
To post, send mail to [hidden email].
Search the archives at http://lincoln.2330058.n4.nabble.com/.
Browse the archives at https://pairlist9.pair.net/mailman/private/lincoln/.
Change your subscription settings at https://pairlist9.pair.net/mailman/listinfo/lincoln.